How To Do Commercial Metal Framing
Framing continues to grow every year with more than 40 of commercial structures now using steel framing and with nearly 500000 homes built with steel framing over the past.
How to do commercial metal framing. You do not need an engineer to design a two-story above-grade structure using the prescriptive method but some jurisdictions may require an engineers stamp. The proper way to handle an inside corner when you use metal stud framing is sliding that first sheet into the inside corner and fastening the last stud adjacent to the drywall. Add header measurements door openings and angles to the floor layout.
Metal cross braces between rows. You have hit the basics well for someone to get started. Every commercial operation requires a unique set of building features and our commercial metal buildings are designed according to use.
Snapping chalk lines is just the start. Set screws first at each end of the metal framing track and then every 3 ft. That means that through working with our experienced design team you can implement all of the custom components.
Be An Industry Leader. Cut each flange of the track on both ends 1 inch 25 cm lengthwise. This is a nice informative article.
We do a lot of metal stud framing on commercial projects. Bend the web down 90 degrees using sheet metal locking pliers. This means you use fewer studs and get a stable joint.
A steel building from General Steel is a versatile solution for a commercial space. So if youre planning to hire people to do the job their labor cost would be lower as there would be less time needed to accomplish framing with metal. Make sure you leave it loose until the drywall goes up.
